CONSTRUCTION STATUS 9-23-2026
Construction Photo Gallery
PHOTOS UPDATED ON 9-23-2026
If you have newer photos please send them in jpeg format to photos@capewindsresort.com, email me at dgrein@capewindsresort.com.
9-22-2026
9-22-2026 RAILINGS INSTALLED ON 9 AND 10 STACKS.
9-22-2026 PROGRESS ON EAST SIDE
9-10-2026 UNITS 509 AND 409 CONCRETE WORK COMPLETED.
WOMEN'S ROOM POOL AREA SHOWER PAN PAINTED
ADDITIONAL DEMO DONE ON FACADE THAT COVERS PIPING FROM ROOF AT 6 STACK. NOTE WHAT WAS EXPOSED AT UNIT 206 IS NOW RUNNING FROM PARTIAL 306 TO GROUND LEVEL.
9-10-2026 4 AND 5 STACKS
9-22-2026 RAILING IN NOW ON 6 AND 7 STACKS
9-22-2026 VIEW FROM 509 BALCONY
8-31-2026 CONCRETE WORK COMPLETED AT 509
9-22-2026 VIEW FROM WHAT APPEARS TO BE 309 BALCONY
9-22-2026 ADDITIONAL VIEW FROM 509 BALCONY
8-14-2026 DAMAGED FACADE COVERING DRAIN PIPE ON 2 OR 3 STACK. PHOTO TAKEN DURING INSPECTION WITH BROADY (KEYSTONE ENGINEER) ON 8-14-2026. RECOMMEND REMOVAL AND REPLACEMENT OF ENTIRE FACADE FROM GROUND TO ROOF DUE TO CONTINUOUS CRACKING ALONG FACE.