CONSTRUCTION STATUS 9-23-2026

You are viewing the Official Website of Cape Winds Resort, 7400 Ridgewood, Cape Canaveral, Fl 32920 Guest Book Local Area Attractions The Board of Directors Construction Status Slide Show

Construction Photo Gallery

PHOTOS UPDATED ON 9-23-2026

 

If you have newer photos please send them in jpeg format to photos@capewindsresort.com, email me at dgrein@capewindsresort.com.

 

9-22-2026

9-22-2026 RAILINGS INSTALLED ON 9 AND 10 STACKS.  

9-22-2026  PROGRESS ON EAST SIDE

9-10-2026  UNITS 509 AND 409 CONCRETE WORK COMPLETED.

 WOMEN'S ROOM POOL AREA SHOWER PAN PAINTED

ADDITIONAL DEMO DONE ON FACADE THAT COVERS PIPING FROM ROOF AT 6 STACK.  NOTE WHAT WAS EXPOSED AT UNIT 206 IS NOW RUNNING FROM  PARTIAL 306 TO GROUND LEVEL.

9-10-2026 4 AND 5 STACKS

9-22-2026 RAILING IN NOW ON 6 AND 7 STACKS

9-22-2026 VIEW FROM 509 BALCONY

8-31-2026 CONCRETE WORK COMPLETED AT 509

9-22-2026 VIEW FROM WHAT APPEARS TO BE 309 BALCONY

9-22-2026 ADDITIONAL VIEW FROM 509 BALCONY

8-14-2026 DAMAGED FACADE COVERING DRAIN PIPE ON 2 OR 3 STACK.  PHOTO TAKEN DURING INSPECTION WITH BROADY (KEYSTONE ENGINEER) ON 8-14-2026.  RECOMMEND REMOVAL AND REPLACEMENT OF ENTIRE FACADE FROM GROUND TO ROOF DUE TO CONTINUOUS CRACKING ALONG FACE.

THIS IS A PHOTO OF A WASHING MACHINE CONNECTION HIDDEN IN WALL BEHIND WASHER.  THIS HAS BEEN LEAKING FOR SOME TIME.  THIS MIGHT BE A GOOD TIME TO INVESTIGATE ANY HIDDEN WATER SUPPLY LINES AND REPAIR BEFORE THE LINE CAUSES DAMAGE TO UNITS BELOW....